CONSTRUCTION OF WATER WORKS

Nam Tien is committed to providing the most professional, quick, and effective wharf structure repair and construction services using the most advanced construction methods: high-strength mortar spraying, anti-corrosion paint for steel reinforcement, anti-corrosion paint. Concrete erosion, carbon fiber and glass fiber paste increase the bearing capacity of the structure.

Construction and repair procedures for wharves

Dredging the wharf water area

Construction of pile foundations using a floating floor system combined with floating means.

Construction of the horizontal and vertical girder system of the wharf using a platform system combined with floating means.

Construction of embankment under wharf using floating and manual means.

Construction of bridge deck.

Construction of reverse filter mausoleum behind the embankment and leveling of the stone mausoleum of the foundation wall at the back corner of the embankment.

Construction of reinforced concrete corner wall system behind the embankment and backfilling soil behind the embankment.

Installation of wharf equipment such as: Anchor flange; Ship cushions; Crane rails etc.

Acceptance and handover of the project.

en_AUEnglish