Scale: Design capacity of 50MW with 13 wind turbines from Vestas Denmark, each with a capacity of 3.8MW-4.0MW along with a complete synchronous operator system and transformer station infrastructure.
Investment objective: Build and manage a power plant using wind energy to generate electricity, connecting to the national grid through a long-term power purchase contract with Vietnam Electricity Group; Providing additional power sources, contributing to ensuring energy security, using clean energy to produce electricity to reduce factors causing environmental pollution; Combining farming, seafood exploitation, and forestry contributes to local socio-economic development.
Location: Hoa Binh district, Bac Lieu province
Total investment: 2850 billion VND.